James Xie’s Design Notebook

week of Feb. 10

Created Design Notebook

Week of Feb. 24

Discussed with team member about next step forwared. The current plan is to have the core, RAM, and ROM working so that we can assemble a working processor.

Week of Feb. 31

The core is still failing some tests. If the problems with the core cannot be solved then we must drop our current design and switch to a simpler version.

Week of March 10

The RAM and ROM are now able to be generated using OpenRAM scripts. The next step is to write tests to verify that the generated RAM is working. Still no updates on the core.

Week of March 17

No work done due to midterms